ECO In-Flight Control: How to Swap Revisions Without Scrapping WIP (and Without Lying)

By Bester PCBA

Last Updated: 2026-01-09

Three technicians in lab coats review a work instruction at an electronics workstation. A laptop displays “REV. D” while a printed traveler is taped to nearby equipment.

A surveillance audit in 2020 produced a familiar scene. Document control pulled up the pristine controlled PDF, the quality manager pointed to the ISO 9001 clause language, and everyone felt briefly safe. Then the auditor walked to the line and found a printed traveler—an old revision—taped to a fixture at a soldering station, right next to the work.

The corrective action that followed didn’t care about how clean the file cabinet was. It cared whether the work itself was controlled, and whether effectiveness checks at 30, 60, and 90 days could prove the fix held.

Factories don’t fail configuration control in meetings. They fail it at the workstation, under fatigue, with paper that shouldn’t exist anymore.

The “operators keep using old travelers” explanation shows up fast in these moments, usually as a plea for more training. Training matters, but it doesn’t remove the stale artifact. It doesn’t stop someone from grabbing the top sheet in a stack, and it doesn’t create an audit trail when the wrong revision ships. If the system allows two truths to coexist—a controlled PDF in one place and an uncontrolled print on a fixture—the factory is running on hope.

No accurate traveler, no shipment.

What “ECO In-Flight Control” Means in Practice

ECO in-flight control isn’t a philosophy or a tool feature. It’s the service layer that sits between a released change and a shipped box: who touches the change, where revision identity gets lost, what gets blocked by default, and what moves with deliberate approvals. In a mixed-model environment, this service layer is often more important than the engineering change itself. The change is rarely the hard part. The hard part is executing it without splitting reality into contradictory fragments across PLM, ERP, travelers, kitting, and the line.

The pressure point is predictable. Someone says “effective immediately”—usually because a field issue or customer escalation spooked engineering—and someone else points at WIP in test, asking how to apply an ECO mid-build without killing throughput.

The binary version of that argument (“today vs. next week”) is mostly theater. The operational question is simpler: at what operation does the new revision become mandatory? OP40 test? OP50 final assembly? OP60 packout? Once effectiveness is anchored to an operation boundary, the service layer can build controls around it instead of relying on verbal intent.

A team can keep shipping and still hold the line on configuration, but the priority has to be explicit. Shipping the wrong revision is worse than delaying shipment, unless there’s a signed, time-bounded deviation/permit to ship that names the exact configuration, quantity, and expiration. Late is negotiable. Wrong revision is a credibility event with an audit trail that lasts longer than the expedite fees.

We’re skipping ECO 101 here. This assumes you know why revisions exist. The real question is how to keep revision identity from evaporating between the release and the box.

Mechanism Trace: From ECO Release to the Box (Where Revision Identity Dies)

When an ECO “touches WIP,” the instinct is to look for the guilty department: engineering was late, planning didn’t communicate, quality blocked too long, the floor “didn’t follow instructions.” That framing misses the mechanism. Wrong-revision shipments are almost always chain failures: PLM says one thing, ERP says another, a traveler gets reprinted without quarantine, kitting pulls old parts because shortages hurt, inspection checks the wrong criteria, and packout labels a configuration that was never built.

The fix isn’t one more meeting. It’s hardening the handoffs where identity is lost.

Start at the release event and walk the chain as if trying to break it on purpose. PLM releases a revision and an ECO number changes status; that revision is supposed to flow into ERP work orders, routing operations, and traveler headers. Somewhere in that flow, revision identity becomes a human memory problem. Someone prints from Arena and stamps “REV C” by hand. Someone updates a NetSuite work order late. Someone keeps an old traveler taped to a fixture because it saves time. That’s the first death: two documents exist that claim to be the contract between intent and reality.

The second death happens when WIP isn’t segregated. Q4 2019 provided a high-cost version of this. An ECO landed mid-week changing a connector footprint and a silkscreen note; it felt small enough that people said “basically the same.” A pallet of boards was already through SMT and waiting for hand-solder. A new traveler was printed from Arena, but the old boards were never quarantined; they moved with the batch because the difference didn’t look dramatic at a glance.

The customer’s incoming inspection caught the mismatch on the first unit and treated it as a configuration control failure, not a solder defect. The cost that stung wasn’t just rework. It was the $78,000 debit memo, the 146 units that had to be quarantined, and the 8D that had to land within 10 business days while the factory tried to reconstruct which serials were built to which truth. The only “trace” for part of that movement was sharpie on a bin label. That’s a wish, not traceability.

The weakest link in that chain isn’t usually the ECO itself. It’s the combination of (1) document selection on the floor and (2) the absence of real WIP segregation when two revisions are simultaneously plausible.

The “training problem” story shows up again here because it’s socially easier than admitting the service layer is leaky. But fatigue and throughput incentives aren’t character flaws; they’re predictable. In 2022 on a box-build line, the failure mode was simple: travelers were printed in stacks, revisions were mixed, and people grabbed whatever was closest—especially on night shift.

The unglamorous fix that changed behavior was enforced selection. Tying traveler barcode scanning to the NetSuite work order and revision meant the station wouldn’t print labels if the scanned traveler header didn’t match the released revision. Zebra printers became part of configuration control, not just labeling. Overrides required QA supervisor credentials, making “just do it” frictional enough to prevent casual drift. The first week produced grumbling about the system “blocking,” but the control did something training cannot: it removed the moment where someone chooses the wrong paper and still gets rewarded with speed.

That same pattern repeats in quarantine, but with different costumes. Many factories have a hold area that is symbolic: a taped square, a shelf, or a cage close enough to the line that it becomes a tempting parts stash when shortages hit.

Early 2023 in a Reno build cell, an ECO changed two passives and a conformal coat spec. Old-revision kits were staged in a physical quarantine cage with red tags—fields for work order number, part number, revision, reason, date, owner. Within a day, someone cut a zip tie and “borrowed” from it because kitting was short on resistors. This isn’t a story about bad people. It’s about system design. If quarantine inventory can be casually consumed, it will be. Shortages hurt, and the cage is visible inventory.

The fix made quarantine both physical and systemic: an ERP location code like Q-REVHOLD that required QA move transactions, and a physical relocation away from the line’s grab radius. A daily quarantine review at 7:10 a.m. pulled the cage out of the mysterious punishment category and into normal operations. The next shortage created a disposition request instead of quiet theft.

A third recurring death is the “ship and send an addendum” shortcut. August 2021 put this on a shipping dock with the truck booked. Units were boxed and staged on pallets when an ECO updated a torque spec and added a washer stack-up on a field-replaceable assembly. Someone suggested shipping and sending an addendum, as if paper could retroactively change what was built.

The better question in that moment isn’t “can it pass functional test.” It’s: “Can the shipment be defended when a customer incoming inspection checklist references a revision letter and a calibrated digital torque wrench shows a due-date sticker tied to the spec?” A stop-ship note is unpopular for 48 hours. The alternative is often an 8D that consumes weeks and reframes the factory as untrustworthy. Expedite fees—on the order of ~$4,500 in that case—are finite. Configuration escapes are not.

There is a specific type of organizational fatigue that comes from celebrating ship heroics. It feels like speed, but it’s actually a downstream tax: containment labor, MRB churn, customer distrust, and internal arguments about “what really shipped” that can last a quarter.

The minimum gates worth enforcing aren’t mysterious. They just require admitting where humans will take shortcuts when incentives are misaligned:

  • One released source of truth for revision, and one allowed pathway for printing travelers; stale paper must be purged, not tolerated.
  • An “effective-at operation” rule so WIP can be preserved without pretending the change is binary.
  • A real quarantine mechanism for old-revision WIP and kits: physical barrier plus an ERP/MES status/location that blocks consumption and requires approvals to move.
  • Enforced document selection at the station (scan gate, print lock, or equivalent) so the wrong traveler cannot be used “by accident.”
  • A narrow deviation/permit-to-ship lane for exceptions, with constraints that survive audit and turnover.
  • A traceability expectation that can be proven quickly, not argued about.

With those gates in place, the rest becomes planning and discipline rather than drama. Without them, the factory is left trying to do revision swaps by speech and hope.

Designing “Effective-At Operation” Without Religious Arguments

A late-2023 debate illustrates why “effective immediately” is the wrong shape of decision in mixed-model lines. Engineering wanted an urgent ECO after a field issue; production pushed back because dozens of units were mid-test with fixtures validated to the prior revision. The conversation started as moral posturing—quality urgency versus throughput survival—until the framing shifted to routing.

The change didn’t need to be “today” in the abstract. It needed to be mandatory at a specific operation boundary: OP40 test, OP50 final assembly, OP60 packout. They chose to cut over at the start of packout (OP60) and quarantined any unit crossing that threshold without the new hardware. A decision log captured who approved the boundary and why, because memory is not an audit artifact.

“Effective-at operation” works because it acknowledges that WIP exists and has physical states. It turns a revision change into a controlled traffic merge: at this point in the route, the new configuration is required; before this point, the old configuration is allowed, but it must be segregated and traceable. That single move also clarifies who must act. Planning updates work order routing and effective operation fields. Materials ensures old-revision parts cannot be kitted into new-effective operations. The line has a clear stop point that can be enforced. Quality has an objective boundary for inspection criteria and disposition.

The enforcement language matters more than the meeting language. A factory can implement this with different tool stacks, but the pattern is stable: block by default, allow with defined approvals, and generate artifacts automatically. For example, a revision-locked work order in ERP can prevent issuing old-revision kits once a work order is at or past the effective operation. A scan at the station can prevent printing packout labels unless the unit’s traveler revision matches the effective revision for OP60. A quarantine location in ERP can require QA to move WIP across the boundary after verification. The exact menu clicks differ across systems. The control surface does not.

There is real nuance here that can’t be hand-waved. Regulated contexts—medical, aerospace, automotive, customer-specific supplier manuals—vary in what “configuration control” requires and in how doc-only changes versus form/fit/function changes are treated. Approval chains, record retention, and the definition of what constitutes a “revision mismatch” are not uniform. The only honest move is to align the effective-at operation rule, deviation workflow, and record set with the customer contract and the site QMS, with a quality/regulatory lead in the loop when required. That said, traveler accuracy and auditable artifacts aren’t optional in any environment that expects control. They are the minimum substrate that makes any compliance claim defensible.

Quarantine That Cannot Be “Borrowed From”

The easiest way to tell whether quarantine is real is to watch what happens during shortages. Early 2023 in Reno, the quarantine cage existed, red tags existed, and the first shortage turned it into a parts pantry. Someone cut the zip tie because the cage was the closest stash and the production pain was immediate. The behavior was predictable, and it was the proof: a quarantine that is convenient to violate isn’t a quarantine. It’s a suggestion.

The design rule is blunt: quarantine must be inconvenient to violate and visible in the system. “Visible in the system” means old-revision inventory has a status/location that prevents normal consumption and requires a controlled move transaction—often by QA—to release it. An ERP location like Q-REVHOLD isn’t just a label; it’s a gate that creates an audit trail. “Inconvenient to violate” means physical access is restricted and the quarantine isn’t parked within easy reach of the line’s gravitational pull. It also means quarantine is reviewed on a cadence, like a daily standup at 7:10 a.m., so it doesn’t become a mysterious punishment box that people feel justified in raiding.

Shortages are often the real antagonist in revision control. A quarantine design that ignores shortage behavior will lose.

The Only Legitimate Fast Lane: Deviation / Permit to Ship (Tight, Expiring, Traceable)

The phrase “can quality just approve it” usually arrives when the organization wants a deviation to function like a blank check. Spring 2018 offered a clean example: a supplier couldn’t meet a plating spec on a batch of metal brackets and proposed shipping anyway. A program manager pushed for a deviation that effectively said “accept as-is until further notice,” with no quantity, no expiration, and no real risk analysis. That turns an exception into a shadow spec by accident.

The deviation was forced into constraints: quantity limited to 200 pieces, expiration set to 30 days, containment defined, and incoming inspection tightened (AQL adjusted) for the affected lot. The supplier later hit the spec again and the organization moved on, but the near-miss remained: without constraints, deviations become lifestyle and the process quietly decomposes.

A deviation/permit to ship can be the right answer, but it isn’t a shortcut around configuration control. It is configuration control, formalized under pressure. The non-negotiable fields are the ones that prevent the exception from spreading:

  • Exact configuration and identifiers: part numbers, revision, affected work orders/serials or lots.
  • Quantity limit and expiration date (and an explicit statement that the deviation is not blanket).
  • Risk rationale that matches the change type (form/fit/function versus documentation-only still needs traveler alignment).
  • Containment actions: inspection escalation, segregation, labeling, and any rework plan.
  • Approval signatures that will still make sense to an auditor months later, including customer-signed evidence when the customer is accepting the risk.

The reason this rigor matters isn’t moral purity. It’s turnover and memory. Verbal acceptances evaporate. Email threads disappear. A constrained deviation, tied to traceable units and a clear expiration, is the only exception path that can survive an audit and still protect the business from “who authorized this” archaeology.

The 10-Minute Traceability Drill (and the Artifacts to Have Tomorrow Morning)

A factory can argue all day about whether it has configuration control. The faster test is a drill. Pick a hypothetical ECO—something like “ECO-1472 affects washer stack-up” or “ECO in the 1400s changes connector footprint”—and ask whether the team can identify affected serials/lots quickly and credibly.

In a 2022 mock recall drill, the first run took around two hours because revision-to-serial-to-lot links were leaky. After tightening traveler links and receiving lot capture, the same kind of retrieval dropped under about 20 minutes. The improvement wasn’t a heroic person. It was the records being structured enough that the story could be reconstructed under pressure.

The minimum record set isn’t glamorous, but it’s what turns control into evidence: receiving inspection logs with lot genealogy, traveler completion records tied to the released revision, rework logs that don’t pretend rework didn’t happen, MRB dispositions that close the loop on use-as-is and deviations, and packout/labeling records that match what was physically built. If any one of those links is missing, the impact analysis becomes guesswork and over-quarantine becomes the default response.

The artifact list a team should be able to produce tomorrow morning is simple and unforgiving: a decision log that states the effective-at operation and approvers, quarantine tags and an ERP location trail that prove segregation, deviation forms with quantity/expiration/configuration/containment, and station-level evidence (scan gates, print locks, or equivalent) that prevents stale travelers from surviving on the floor. If those artifacts don’t exist, then “ECO in-flight control” isn’t a system. It’s an aspiration with a shipping schedule.